Table of Contents

Page templates:

Tools Template
Equipment Template
Hardware Template
Supplies Template
Instructions Template
Install fresh water lines in 2 water tanks

Listing Pages

Hardware List

Build Instructions

Done before van arrives

Power Plate Assembly
Fridge Cabinet Assembly w/ toilet drawer
Prep Countertops
Make walnut strip
Assembly Bed Base (include crate spacers)
Cabinet Assembly including metal parts
Build drawers
Wire Cabinet
Plumbing cabinet
Prep and Varnish Panels
Prep Bed Tops
Assemble LED light strip
Make pull rod

Day 1

Fuel line to tank 45 minutes
Heater Bracket Install 45 minutes
Shore Power plug 30 minutes
Toilet Vent 30 minutes
AC Vents 45 minutes
Roof vent install 30 minutes
Roof Wire Box 30 minutes
DC to DC wire 30 minutes
Cross Van Wires 45 minutes
Glue Roof grid
Glue Driver Wall Grid
Glue Passenger wall box
Glue Rear door cubbies
Glue above slider door pieces in

Day 2

Heater Install Inside Van
Heater Install Under Van
Solar, Puck, and vent wiring
Insulate ceiling and driver wall
Install ceiling panels
Driver side wall
AC Vent Install
Install and Insulate Floor
6mm bed base tops
Install pull rod
Power Plate and battery Install
Power Plate Cover

Power Panel Install

Driver ceiling corner cover and fan

Bed and bed base: Bed Top Install
Bed Back Install
Bed Back Block Magnet and felt
Bed stops and latch pin

Rear Door Assembly
Insulate doors
Box Above Rear Doors
Strechy Cords for Cubbies
Build Heater Step

Configure Victron Components

Install trim panels above slider door
Install slider door panel
Rear inner and outer door panel install
Staple black ABS pieces
Install Fridge Cabinet
Install backsplash and countertop to sink cabinet
Install faucet and soap dispenser
Make and install undersink door
Run drain lines and install lower AC duct
Install hold down strap for AC
Make and install aluminum parts. FloorEdge waterbottle, Toilet glide strip

Make and install bed back magnet
Install front roller wheel and bracket
Insulate and install top for heater step
Install bed pull straps
Install toilet and toilet drawer with twist lock
Wire toilet and fridge
Install panel above sink
Install TV bracket and mount
Install drawers and drawer slide blocks
Assemble and install keyboard drawer
Align and install drawer fronts
Make and install bed legs

Install stretchy cords in cubbies and back doors
Install above slider door parts
Put bottom cover on box over rear doors after insulating it
Put corner rubber on boxes above both doors
Install solar panels
Install Lemans fan
Drill and install front curtain rod
Seat belt bolt and cover install
Finalize puck lights
Drill and install grey water tank
Test plumbing
Test heater
Mount Induction Cooktop with Museum Putty
Water bottle and AC straps

Auto-stripper